Project Title: Koura Way Four Lane Road

 

KouraWay

 

Project Purpose / Background:

The purpose of the Project was to provide Topographic Survey, Geotechnical Site Investigation and Detailed Design & Documentation. Rumbam Engineers provided consultancy service of the 4.4 kilometres 4 lane Highway in Port Moresby, National Capital District.

The project was funded by our client the China Harbour Engineering Corporation. The overall project cost was K90 Million and the consultancy service cost was K3.4 Million.

 

Type of Project: Highway Design Project (Four Lanes)

 

Project Sponsor: China Harbour Engineering Corporation (CHEC) 

 

Project Client: National Capital District Commision

 

Project Location: Port Moresby, National Capital District, Papua New Guinea

 

Project Duration:

The project commenced on the 10th of December, 2013 and ended on the 28th of July, 2014 (7 Months).

 

 

Project Title: Koura Way Roundabout to Badihagwa Roundabout

 

Project Purpose / Background:

The purpose of the Project was to provide Topographic Survey, Geotechnical Site Investigation and Detailed Design & Documentation for the highway from Koura Way Roundabout to Badihagwa Roundabout in the National Capital District.

Rumbam Engineers provided consultancy service of the 0.7 kilometres 4 lane Highway linking Koura Way Roundabout to Badihagwa Roundabout in Port Moresby, National Capital District, Papua New Guinea.

The project was funded by our client the National Capital District Commission. The overall project cost was K30 Million and the consultancy service cost was K130.000.00.

 

Type of Project: Highway Design Project (Four Lanes)

 

Project Sponsor: National Capital District Commision (NCDC)

  

Project Client: National Capital District Commision

 

Project Location: Port Moresby, National Capital District, Papua New Guinea

 

Project Duration:

The project commenced in April, 2014 and ended in November, 2014 (4 Months).

 

 

Project Title: Koura Way Roundabout to Poreporena Road

 

Project Purpose / Background:

The purpose of the Project was to provide Topographic Survey, Geotechnical Site Investigation and Detailed Design & Documentation for the highway from Koura Way Roundabout to Poreporena Road in the National Capital District.

Rumbam Engineers provided consultancy service of the 1 kilometre 4 lane Highway linking Koura Way Roundabout to Poreporena Road in Port Moresby, National Capital District, Papua New Guinea.

The project was funded by our client the National Capital District Commission. The overall project cost was K50 Million and the consultancy service cost was K150.000.00.

 

Type of Project: Highway Design Project (Four Lanes)

 

Project Sponsor: National Capital District Commision (NCDC)

    

Project Client: National Capital District Commision

 

Project Location: Port Moresby, National Capital District, Papua New Guinea

 

Project Duration:

The project commenced in June, 2014 and ended in September, 2014 (3 Months). 

 

 

Project Image Gallery

Shown below are images of the project from design to construction / implementation. Click on the images for full screen view:

Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images
Koura Way Four Lane Road Images